Sunday, February 24, 2013

Donald Lim offers simple solution for stalled TNB project



<b>Good luck charm:</b> Lim (second right) presenting ang pow packets to children during the Chinese New Year Open house that was held at Greenpark basketball court in Rawang. Good luck charm: Lim (second right) presenting ang pow packets to children during the Chinese New Year Open house that was held at Greenpark basketball court in Rawang.
 
THE Central Reinforcement Area (CAR) project in Kampung Sungai Terentang in Rawang, that is currently at a standstill, can be resolved if the Selangor government is willing to cooperate with the Federal Government, said Selangor MCA chief Datuk Donald Lim.

He said although the problem could be overcome, the state government was refusing to cooperate.

Tenaga Nasional Bhd’s (TNB) CAR project, which was started in 2005, involved the installation of 60km of high-voltage cables between Bukit Tarek in Rawang and Kampung Chubadak in Sentul.

With 1.5km yet to be completed at Kampung Sungai Terentang in Rawang, the project had stalled for over four years after objections from local residents.

“The solution is for the project to go through the industrial area behind Kampung Sungai Terentang, instead of over the houses,” he said.

Lim said this after presenting ang pow to children, senior citizens and those who attended the Selayang MCA Chinese New Year open house held at the Greenpark basketball court in Rawang recently.

He also said it was Selangor Mentri Besar Tan Sri Abdul Khalid Ibrahim’s duty to ensure the well-being of the people in the state.

“When Pakatan Rakyat took over Selangor, they promised to resolve the issue within 100 days. Until now, it has not been resolved,” he said.

Selayang MCA division chairman Datuk Tang See Hang, who was also present, said the big crowd at the dinner was proof of the people’s support for MCA.

1 comment:

Anonymous said...

VEN. ASHIN INDAKA: CROOK”DIRTY SEX” OF MYANMAR BUDDHIST MONKS
http://www.youtube.com/watch?v=Sbfptk60--E&feature=youtu.be
Kepada rakyat Malaysia yang hormati,
Suka-lah kita memberitahu bahawa Sami Negera Myamnar kebanyakannya ajaran sesat, banyak permikirannya yang tak betul, main perempuan, tipu wang orang ramai dan lain-lain.

Seorang Myanmar Sami Buddha (VEN. ASHIN INDAKA) bertinggal SAMNAK SAMBODHI BUDDHIST TEMPLE, NO: 19 JALAN 38 TAMAN DESA JAYA, KEPONG, KUALA LUMPUR, 52100 MALAYSIA (YIP KUM FOOK”MCA GOMBAK” PRESIDENT) yang sama jahat.

Harap orang ramai, khasnya rakyat Malaysia mesti jauhkan sami Myanmar ini. kami harap juga Kerajaan Malaysia lebih mengambil perhatian Sami Buddha yang di upah dari luar Negeri, supaya rakyat Malaysia dan Nagera dapat di selamatkan. Sekian, Terima Kasih

Respect to people of Malaysia,
Likely, we are told that the Myanmar monks mostly false teaching, many impress notions which are not right, play girl, cheating of the public money and others.

Myanmar Buddhist Monk (VEN. ASHIN INDAKA) stayed at SAMNAK SAMBODHI BUDDHIST TEMPLE, NO: 19 JALAN 38 TAMAN DESA JAYA, KEPONG, KUALA LUMPUR, 52100 MALAYSIA (YIP KUM FOOK”MCA GOMBAK” PRESIDENT) as same bad.

Hope all people; especially Malaysians must far away Myanmar's monks. We hope more Malaysia’s Government also noted that the wages of Buddhist monks from the other countries, so that the Malaysian and country can be saved. Thank you

尊敬的马来西亚人民,
我们想告知,缅甸僧侣多半是假的教学,观念是不正确的,玩女人,谎言,欺骗金钱………

缅甸佛教的僧侣 (VEN. ASHIN INDAKA) 住在 SAMNAK SAMBODHI BUDDHIST TEMPLE, NO: 19 JALAN 38 TAMAN DESA JAYA, KEPONG, KUALA LUMPUR, 52100 MALAYSIA (YIP KUM FOOK ” MCA GOMBAK” PRESIDENT) 同样糟糕。

希望所有的马来西亚人, 都应该注意远离缅甸的僧侣。我们更希望马来西亚政府注意,外来的僧侣. 谢谢

EVRERYONE CLICK HERE TO SEE MORE INFORMATION: http://www.youtube.com/watch?v=Sbfptk60--E&feature=youtu.be
“VEN. ASHIN INDAKA (MYANMAR): CROOK OF MYANMAR BUDDHIST MONKS (MUST WATCH)”